• LASA and INFN
• Group and roles
• Resources
• Group and roles
• Cavities, PIC
• Documents
• Transports
• Inspections templates
• Travelers
• Alignment matrix
• Fermilab point of view
• Expectations
Design change control (Sec. 6.0 of the INFN PIP-II QA Plan)
• Feedback from vendors to the project
Design change control (Sec. 6.0 of the INFN PIP-II QA Plan)
• Feedback from vendors to the project – past experiences, know-how, examples
Vendor Management (Sec. 8.0 and 9.0 of INFN PIP-II QA Plan)
• Quality Assurance at the vendors
• QCP, MIP, AL1-3
Manufacturing Inspection Plans
• Expectations
Product Acceptance (Sec. 10 of INFN PIP-II QA Plan)
• Acceptance levels during production, AL4-5
• AC list and plan
• Final acceptance