INFN PIP-II Quality Planning Workshop
-
-
Part I
-
1
Introduction from INFN
• LASA and INFN
• Group and roles
• ResourcesSpeaker: Rocco Paparella (Istituto Nazionale di Fisica Nucleare) -
2
Introduction from Fermilab
• Group and roles
Speaker: Joe Ozelis (Fermilab) -
3
INFN - Flow chart for the series production
• Cavities, PIC
• Documents
• TransportsSpeaker: Rocco Paparella (Istituto Nazionale di Fisica Nucleare) -
4
INFN - Document management
• Inspections templates
• Travelers
• Alignment matrixSpeaker: Laura Silvia Monaco (Istituto Nazionale di Fisica Nucleare) -
5
INFN - Non-conformance handlingSpeaker: Aldo Tommaso Grimaldi (Istituto Nazionale di Fisica Nucleare)
-
6
FNAL - Non-conformance handling
• Fermilab point of view
• ExpectationsSpeaker: Matt Luedke -
16:15
Discussion
-
1
-
16:30
Coffee Break
-
Part II
-
7
FNAL - Design change control
Design change control (Sec. 6.0 of the INFN PIP-II QA Plan)
• Feedback from vendors to the projectSpeaker: HyeKyoung Park -
8
INFN - Design change control
Design change control (Sec. 6.0 of the INFN PIP-II QA Plan)
• Feedback from vendors to the project – past experiences, know-how, examplesSpeaker: Laura Silvia Monaco (Istituto Nazionale di Fisica Nucleare) -
9
INFN - Vendor management
Vendor Management (Sec. 8.0 and 9.0 of INFN PIP-II QA Plan)
• Quality Assurance at the vendors
• QCP, MIP, AL1-3Speaker: Aldo Tommaso Grimaldi (Istituto Nazionale di Fisica Nucleare) -
10
FNAL - Manufacturing inspection plans
Manufacturing Inspection Plans
• ExpectationsSpeaker: Matt Luedke -
11
INFN - Product acceptance
Product Acceptance (Sec. 10 of INFN PIP-II QA Plan)
• Acceptance levels during production, AL4-5
• AC list and plan
• Final acceptanceSpeaker: Laura Silvia Monaco (Istituto Nazionale di Fisica Nucleare) -
17:50
Discussion and Close-out
-
7
-