24–30 Sept 2017
La Biodola, Isola d'Elba
Europe/Rome timezone

Status and Objectives of the Dedicated Accelerator R&D Facility "SINBAD" at DESY

25 Sept 2017, 16:50
20m
SB2, Sala Bonaparte 2, HH

SB2, Sala Bonaparte 2, HH

talk WG3 - Electron Beams from Electromagnetic Structures, Including Dielectric and Laser-driven Structures WG3_Parallel

Speaker

Mr Ulrich Dorda (DESY)

Description

We present an status update on the dedicated R&D facility SINBAD which is currently under construction at DESY. The facility will host multiple independent experiments on the acceleration of ultra-short electron bunches and novel, high gradient acceleration methods. The first experiment is the ARES-experiment with a normal conducting 100MeV S-band linac at its core. We present the objectives of this experiment ranging from the study of compression techniques to sub-fs level to its application as injector for various advanced acceleration schemes e.g. the plans to use ARES as a test-site for DLA experiments in the context of the ACHIP collaboration. The timeline including the planned extension with laser driven plasma-wakefield acceleration is presented. The second initial experiment is AXSIS which aims to accelerate fs-electron bunches to 15 MeV in a THz driven dielectric structure and subsequently create X-rays by inverse Compton scattering.

Primary author

Mr Ulrich Dorda (DESY)

Co-authors

Barbara Marchetti (DESY) Dr Ralph Assmann (DESY)

Presentation materials