30 September 2014 to 3 October 2014
C.U.M.O. Noto (SR), Italy
Europe/Rome timezone
RICAP-14 The Roma International Conference on Astroparticle Physics in Noto, Sicily, Italy

Status and perspectives of the Baikal-GVD project

1 Oct 2014, 16:30
30m
Aula A, first floor (C.U.M.O. Noto (SR), Italy)

Aula A, first floor

C.U.M.O. Noto (SR), Italy

Speaker

Prof. Zhan-Arys Dzhilkibaev (Institute for neuclear research, Moscow)

Description

The second-stage neutrino telescope Baikal-GVD in Lake Baikal will be a research infrastructure aimed mainly at studying astrophysical neutrino fluxes by recording the Cherenkov radiation of the secondary muons and showers generated in neutrino interactions. The design for the Baikal-GVD neutrino telescope is an array of photomultiplier tubes each enclosed in a transparent pressure sphere to comprise an optical module (OM). The OMs are arranged on vertical load-carrying cables to form strings. The final configuration of telescope will consist of 27 clusters of strings – functionally independent subarrays, which are connected to shore by individual electro-optical cables. The prototyping/early construction phase of the Baikal-GVD project which aims at deployment and operation of the first Demonstration Cluster has been started in 2011. Demonstration Cluster will comprise eight 345 m long strings of optical modules – seven peripheral strings are uniformly arranged at a 60 m distance around a central one. Each string comprises 24 OMs spaced by 15 m at depths of 950–1300 m below the surface. Also the Demonstration Cluster will comprise an acoustic positioning system and an instrumentation string with equipment for array calibration and monitoring of environment parameters. An important step on realization of the GVD project was made in 2013 by the deployment of the first stage of Demonstration Cluster which contains 72 OMs arranged on three 345 m long full-scale strings, as well as equipment of an acoustic positioning system and instrumentation string with an array calibration and environment monitoring equipment. This configuration has been upgraded to 5 string array with total of 112 OMs in 2014. Deployment of the Demonstration Cluster will be completed in 2015. The review of the design and status of the Demonstration Cluster construction will be presented.

Primary author

Prof. Zhan-Arys Dzhilkibaev (Institute for neuclear research, Moscow)

Presentation materials