Thomas Nilsson
(Fundamental Physics, Chalmers University of Technology, Gothenburg, Sweden)
21/05/2012, 17:00
Future RIB facilities
Oral
The FAIR (Facility for Antiproton and Ion Beams) installations, to be constructed at the GSI site in Darmstadt, will be addressing a wealth of outstanding questions within the realm of subatomic, atomic and plasma physics through a combination of novel accelerators, storage rings and innovative experimental set-ups. One of the key installations is the fragment separator Super-FRS that will be...
Dr
Andrey Fomichev
(FLNR JINR)
21/05/2012, 17:30
Future RIB facilities
Oral
The new project of the in-flight fragment separator ACCULINNA-2 [1] at U-400M cyclotron in Flerov Laboratory of Nuclear Reaction, JINR is proposed as the third generation of the Dubna Radioactive Ions Beams complex, briefly DRIBs [2]. It is expected to be a more universal and powerful instrument in comparison with existing separator ACCULINNA [3]. The RIBs intensity should be increased by...
Dr
Lucia Popescu
(SCK-CEN)
21/05/2012, 17:50
Future RIB facilities
Oral
The idea of ISOL@MYRRHA was born 5 years ago, when a feasibility study was initiated within the “Belgian Research Initiative on eXotic nuclei” network project. This facility should use up to 5% of the 2-4 mA proton beams delivered by the MYRRHA linac, for the production of Radioactive Ion Beams (RIBs) via the Isotope Separator On Line method. By combining the high primary-beam intensity (up to...