WP5 meeting

Europe/Rome
    • 14:30 14:50
      Rountable 20m
      Speaker: Stefano Piacentini (GSSI and INFN LNGS)

      Report about Rb-83 source investigation:

      • confirmed Rb-83 source is only produced by the Nuclear Physics Institute of the Czech Academy of Sciences (UJF) in Europe
      • on Thursday I will meet with the Xenon responsible to evaluate the possibility to use their source for 2-3 days every 2-3 months
      • The Rb-83 half-life is 86 days (~3 months), therefore their source is ok for our porpuses
      • If we can easily use their source and avoid the source purchase, we will go for this solution

       

      Report by Davide P about the HV box:

      • Box is ready, still working on the connectors and feedthrough to the copper box
      • In principle ready at the end of the months
      • Needed stability tests on both sides of the detector

       

      Report by Herman about the Trigger module

      • Working on upgrade needed for pre-commissioning
      • Building from scratch a new module (LIME one will be used as spare)
      • Still missing some components for the final assembly -> purchased by Davide P at CERN
      • New logic: 16 input channels, 1 trigger-out, 1 EXT-TRG, 4 unused channels but in princible available for I/O
      • New scheme for the control registers  
    • 14:50 15:10
      HV scheme layout 20m
      Speaker: Davide Pinci (Istituto Nazionale di Fisica Nucleare)
    • 15:10 15:30
      Updates on the Trigger Module 20m
      Speakers: Herman Pessoa Lima (CBPF), Herman Pessoa Lima Júnior (Gran Sasso Science Institute)