Speaker
Prof.
Samo Korpar
(University of Maribor)
Description
We summarize the status and present examples of the physics reach of the Belle II detector at the upgraded KEKB electron positron collider - a Super B Factory. Both the accelerator and the Belle detector are currently being upgraded to resume the operation with almost two orders of magnitude higher luminosity in 2014.
Primary author
Prof.
Samo Korpar
(University of Maribor)