ATTENZIONE: Lunedì 15 Luglio, dalle 13:00 alle 15:00 sarà effettuato un intervento di manutenzione su agenda.infn.it. Durante tale fascia oraria il servizio potrà risultare non raggiungibile.


ATTENTION: On Monday 15 July, from 1:00 pm to 3:00 pm, maintenance will be carried out on agenda.infn.it. During this time slot, the service may be unreachable.

19–29 Oct 2015
INFN - Laboratori Nazionali di Frascati
Europe/Rome timezone

LHCb VELO Upgrade

Not scheduled
20m
INFN - Laboratori Nazionali di Frascati

INFN - Laboratori Nazionali di Frascati

Speaker

Ms Emma Buchanan (University of Bristol)

Description

During Long Shutdown 2 (LS2) of the LHC, LHCb will undergo a series of upgrades to all of its sub detectors. LHCb aims to run at luminosity 5 times greater than the current luminosity, requiring upgrades to the readout to all of the sub detectors and redesign of all front end electronics. The increased rate means many of the detector components will exposed to much harsher running conditions therefore the new detector components must be radiation hard. This is most critical for the Vertex Locator (VELO) due its proximity to the beam. The upgraded VELO will consist of lightweight pixel hybrid pixel sensors. Silicon sensors will be bump bonded to a custom developed Velopix front end ASICs. Currently silicon sensors of different characteristics are being extensively tested in both a lab and test beam environment to determine which will be used VELO.

Primary author

Ms Emma Buchanan (University of Bristol)

Presentation materials

There are no materials yet.