5–10 Feb 2012
INFN-LNF <!-- ID_UTENTE=503 -->
Europe/Rome timezone

Calibration of the RPC working voltage in the CMS experiment

6 Feb 2012, 16:40
20m
<B>Aula B. Touschek, Bldg 36</B> (INFN-LNF <!-- ID_UTENTE=503 -->)

<B>Aula B. Touschek, Bldg 36</B>

INFN-LNF <!-- ID_UTENTE=503 -->

Via Enrico Fermi,40 Frascati
oral presentation Performance of RPC systems Performance of RPC systems

Speaker

Silvia Costantini (University of Ghent)

Description

The working voltage of all the RPCs installed in the CMS experiment has been tuned with a dedicated HV scan with LHC collisions during the low luminosity operations. The procedures and the results of the HV calibration will be presented.

Author

RPC CMS (CMS)

Presentation materials