The meeting will address the followig topics:
-
Presentation of the status for each WU
-
Presentation of the status of tunnel preparation
-
In-kind contracts and criticalities
-
Aspects of Beam Physics
-
Beam diagnostics issues
-
Safety Prescription
-
Radiation safety and limitations during the commissioning phase
-
Interface between LEBT and RFQ
-
Interface between RFQ and MEBT
-
Interface between MEBT and DTL
-
Interface between DTL and Spoke
-
Transport and integration Risks
-
Room availability for storage and assembly
-
Significant changes to original planning
-
Planning issues not yet solved
-
Actions to be assigned
-
Safety issues and radiation safety during installation phase
-
RATS and installation simulations