● DavideP report
First GEM stack in N2 atmosphere since 29/04
HV On since 30/04 (2.5 kV/cm + VGEM = 500V) with local version of DAQ
Today 15.30 Meeting with referee: https://agenda.infn.it/event/52170/
● Elisabetta report
- LIME Copper storage: I will take a photo of the target zone where to stock the LIME Copper and ask again to Jan Harms
● DavideF report
-
Cathodes: shipment of the new cathodes is ongoing. Assembly should be scheduled as soon as they arrive at LNF.
-
Second GEM stack: assembled successfully, but a short on the second foil was identified. A dedicated tool is needed to isolate the shorted GEM sector and resolve the issue; afterwards, tensioning and validation will proceed.
-
Field cage / Nylon66 structure: the field cage has been unmounted because the short Nylon66 bar positions interfere with the source calibration path. The new positions have been defined; Daniele now needs to update the original CAD, after which the pieces will be machined, cleaned, and remounted, hopefully within this week.
-
Field cage foil: the test assembly was successful. Once the Nylon66 bars are retrofitted, the final installation can proceed.
-
Copper box drawings: Cesidio is expected to provide feedback this week on the constructive drawings of the copper box.
● Giorgio report
Analysis
- Meeting with Australians postponed to this week
- Melba is working on finding NR on Run4 lowgain
- New student from Brasil is trying to move on from Giuseppe's work on track finding from images
- More quantitative measurement of saturation of V-bonded GEMs and improvement from previous GEMs
LNF
- PMT testing is over
- 20 characterized PMTs and working 6 were old and broken by helium
● Stefano report
Trigger Module:
- integration of the MIDAS frontend: done and tested
- integration of the software update as a consequence of the trigger update: done and testes
- Channel 0 is not properly being processed: Herman believes it's a firmware related issue and he's working on that
- AND and OR logic: not working as expected, Herman is working on that
- TRG EXT function: the output signal shows very annoying bounces that must be solved as TRG EXT is a feature we are probably going to use a lot
● Giulia report
- Improved LIME simulation: New source window provided by DavideP. I'm trying to run a simulation to see the effect
- I am asking for feedback about Emanuele's work on the data corrections
- I talked with Fabrizio and explained to him how to sum the CYGNO04 simulation, he will try to run some of them and I will try to analyse them