1. Meeting Schedule & Participants' Availability
-
Salvatore, who is currently on sabbatical at BNL, requested adjusting the meeting time to the afternoon to accommodate the 6-hour time zone difference.
-
Reverting the meeting to Tuesday is not feasible due to scheduling conflicts with the SIDIS-PWG and PAC meetings.
-
The team discussed general availability and identified a few potential time slots, which will be proposed to Salvatore shortly.
-
Action Item: Propose the newly identified time slots to Salvatore to finalize the new meeting schedule.
2. Performance Plots
-
Lorenzo provided an update on the performance plots that Ralf requested a few weeks ago for the SIDIS-PWG meetings.
-
The presentation is not yet ready due to other urgent tasks, but Lorenzo confirmed it will be prepared for one of the upcoming meetings.
-
Additionally, this material will serve as the content for Lorenzo's talk at the upcoming DIS26 conference.
-
Action Item: Lorenzo to complete the performance plots presentation for a future SIDIS-PWG meeting.
3. Pseudodata Production for Marco Radici
-
Lorenzo has started drafting the table with the kinematic variables and cross-section values requested by Marco.
-
The column for systematic errors still needs to be updated. This is a critical step for producing the pseudodata, but the exact method for calculating these errors remains unclear.
-
Lorenzo has reached out to Anselm and Connor via email for guidance but has not yet received a reply.
-
Action Item: Follow up with Anselm and Connor regarding the calculation of systematic errors.
4. Simulation Campaigns
-
The current results included in Lorenzo's table were obtained using the 10x275 configuration.
-
Lorenzo reported an issue accessing the 10x130 and 10x250 configurations from the March simulation campaign, as they do not appear to be archived in the same directory/location as the other campaigns.
-
Action Item: Investigate and clarify how to retrieve the missing data for the 10x130 and 10x250 configurations.