Choose timezone
Your profile timezone:
https://cern.zoom.us/j/9986349634?pwd=VWpmR0ppakg0LzFDbjBWMG1vdGhrZz09
Update from Trieste (Laura)
1) We have almost all parts to assemble the setup to test the ITS3 FPC, of which we have one prototype. We are waiting for the delivery of some connectors (timescale Nov 25 - Jan 26).
2) We have discussed with LTU the production of FPC prototypes for the SVT IB to test data transmission (25 cm long differential pairs) and to test wire bonding. The specs are finalized. LTU is preparing the designs and then we will discuss the last technical aspects. In the meantime, we are working through the admin steps to place the order.