Cryostat Design Meeting

Europe/Rome
Piazzale Aldo Moro, 5 Edificio di Fisica “Guglielmo Marconi” Sala Lauree (1st Floor)
Description

Please register for the participation to the Cryostat Design Meeting

 

For more information (venue, accomodation, meals, general help):

Fulvio Ricci +39 3483187354

Ettore Majorana +39 3384860816

Van Long Francesco Hoang +39 3275695635, vanlong.hoang@uniroma1.it

Registration
Participants
Participants
  • Emanuele Tofani
  • Joachim Wolf
  • Kevin Pressard
  • philippe rosier
  • Piero Rapagnani
  • Stefan Hanke
  • Stefano Pirro
  • Steffen Grohmann
  • +11
    • 1
      Introduction

      Flow chart and definition of the goals of the workshop.

    • 2
      Cryostat seed design

      Main mecahnical components and the main numerical constraints of the cryostat are defined. (volumes, placeholders)

      Presentations and discussion are open.

    • 11:00
      Break
    • 3
      Cooling interface to the payload

      The main elements of cooling interface that link the payload to the cryostat are defined according to a realistic seed scheme.
      Both radiation (through emissivity) and conduction play a role.

      The cooling model is not presented yet. The target is the definition of a mechanical scheme to be used for the successive step: the thermal simulation

      +10 min discussion

    • 4
      Thermal Modelling OTS, ITS ,IITS, CPAY

      Preliminary overall modelling of the cooling transient for OTS, ITS, IITS

      2-3 presentations and discussion

    • 13:00
      Lunch
    • 5
      Cleanliness

      Definition of strategies for the cleanliness of the payload and its surroundings.

    • 6
      Safety

      Definition of :

      1. safety requirements for work in confined space (emergency exits);
      2. emergency operations for operators
    • 15:45
      Break
    • 7
      Deployment and Integration of Cryostat/Payload
    • 8
      1st day conclusions
    • 9
      Work method definition

      Definition of work methods such as platform interface (i.e. Microsoft Teams..), CAD models interaction, file codification

    • 10
      Work groups definition

      Define who is responsible of each design item.
      Design items are defined the previous day.

    • 10:40
      Break + Laboratory Visit
    • 11
      Work group definition (continue)