May 20 – 25, 2012
Centro Congressi delle Venezie, Hotel Alexander Palace - Abano Terme (Padova) - Italy
Europe/Rome timezone
Conference Programme now available!

Session

Future RIB Facilities

Future 2
May 21, 2012, 5:00 PM
Centro Congressi delle Venezie, Hotel Alexander Palace - Abano Terme (Padova) - Italy

Centro Congressi delle Venezie, Hotel Alexander Palace - Abano Terme (Padova) - Italy

Via Martiri D'Ungheria, 24 35031 Abano Terme (Padova) ph. +39.049.8615111 Fax +39.049.8615199

Presentation materials

There are no materials yet.

  1. Thomas Nilsson (Fundamental Physics, Chalmers University of Technology, Gothenburg, Sweden)
    5/21/12, 5:00 PM
    Future RIB facilities
    Oral
    The FAIR (Facility for Antiproton and Ion Beams) installations, to be constructed at the GSI site in Darmstadt, will be addressing a wealth of outstanding questions within the realm of subatomic, atomic and plasma physics through a combination of novel accelerators, storage rings and innovative experimental set-ups. One of the key installations is the fragment separator Super-FRS that will be...
    Go to contribution page
  2. Dr Andrey Fomichev (FLNR JINR)
    5/21/12, 5:30 PM
    Future RIB facilities
    Oral
    The new project of the in-flight fragment separator ACCULINNA-2 [1] at U-400M cyclotron in Flerov Laboratory of Nuclear Reaction, JINR is proposed as the third generation of the Dubna Radioactive Ions Beams complex, briefly DRIBs [2]. It is expected to be a more universal and powerful instrument in comparison with existing separator ACCULINNA [3]. The RIBs intensity should be increased by...
    Go to contribution page
  3. Dr Lucia Popescu (SCK-CEN)
    5/21/12, 5:50 PM
    Future RIB facilities
    Oral
    The idea of ISOL@MYRRHA was born 5 years ago, when a feasibility study was initiated within the “Belgian Research Initiative on eXotic nuclei” network project. This facility should use up to 5% of the 2-4 mA proton beams delivered by the MYRRHA linac, for the production of Radioactive Ion Beams (RIBs) via the Isotope Separator On Line method. By combining the high primary-beam intensity (up to...
    Go to contribution page
Building timetable...