Rete MS&TA - Enrico Leo " A new test facility for the site acceptance test  of SIS100 quadrupole doublet modules"

Europe/Rome
Description

Data e ora:
26 Maggio 2022. H 15:00

Relatore:
Enrico Leo (Gruppo Collegato di Salerno)

Titolo:
"A new test facility for the site acceptance test  of SIS100 quadrupole doublet modules"

La stanza zoom:

Argomento: INFN-A seminario della rete MS&TA
26 Maggio 2022. H 15:00

Entra nella riunione in Zoom

Argomento: INFN-A riunione della rete MS&TA
Ora: 26 mag 2022 03:00 PM Roma

Entra nella riunione in Zoom
https://infn-it.zoom.us/j/83792295107?pwd=MmtsNjAzZ21ZOUdpZDBvakhaSnlFdz09

 

    • 3:00 PM 3:45 PM
      A new test facility for the site acceptance test  of SIS100 quadrupole doublet modules 45m

      New test facility for SAT of SIS100 quadrupole doublet modules
      Enrico Leo
      The SIS100 synchrotron is presently under construction, and it will be part of the FAIR particle
      accelerator facility at GSI-Darmstadt. The bending, focusing, as well as high order corrections of the
      ion beam is demanded to superconducting magnets (dipoles, quadrupoles and correctors).
      Quadrupoles and correctors are integrated in modules, together with temperature sensors, vacuum
      gauges and beam diagnostic systems. To ensure the quality standard, after the warm factory
      acceptance test, also cryogenic tests on the modules have to be carried out before installation in the
      SIS100 tunnel. Following a MoU between GSI and INFN, a new test facility for site acceptance test
      on quadrupole doublets modules (QDM) has been set up in Salerno. The test facility has been
      designed to fulfill the requirements of the GSI test protocol. The protocol foresees a full
      characterization of the QDM going through electrical tests, sensor and beam diagnostic integrity and
      functionality, heat load measurements, as well as vacuum quality. All of these tests have to be carried
      out at different conditions: room temperature/pressure, under vacuum from room temperature to 4.5K
      and at room temperature/pressure again. The design and commissioning of the test facility in Salerno
      will be presented together with preliminary results obtained during the first cooldown of the prototype
      superconducting modules (FoS).

    • 3:45 PM 4:00 PM
      Discuzione 15m