Participants:
Gigi, Fabrizio, Andrea, Riccardo, Mauro, Francesco, Giuseppe, Stefano, Eugenio
- SVT (Riccardo)
Riccardo and Andrea agreed to merge the last code developments made by the Riccardo
into the "monolithic" Bruno trunk and then to migrate the new code into the "packaged"
Bruno trunk.
- DCH (Giuseppe)
Giuseppe reports that a cross check evaluation of the amount of electronic material on the
backward part of the DCH is on the way. The results should be ready by next week.
- PID (Eugenio for Leonid)
Leonid's model of the forward TOF coded in GDML successfully inserted into the SuperB.
Eugenio assigned a new envelope to accomodate for it (see his presentation for the
details of geometrical dimensions).
Work in progress for the new gdml model of the new DIRC readout.
Eugenio will sensitize the TOF material by the end of the week.
- EMC (Stefano)
Stefano is still investigating on the fwd. endcap overlaps reported by root. Andrea suggests
to use the Geant4 geometry check. Stefano will do that in the forthcoming week.
IFR people would like to know if the backward EMC will be put into the SuperB model for
the Winter Production. Stefano reports that the bwd. Pb EMC is already coded in gdml.
Fabrizio tels us that some tests on it were already done by Chih-hsiang Cheng.
-IFR (Gigi and Mauro)
Mauro committed this morning a new version of the IFR with improved readability of the code.
They desires some more time to perform the Geant4 geometry checks besides the root ones
that at present are successfully passed.
They need more informations from the Monte Carlo truth. Andrea agreed to modify the code
to capture the entrance point, momentum and pid of a particle inside a volume
in addition to the same informations at the exit point. Andrea needs the cooperation of Mauro and
Gigi to implements these new features before Xmas (freezing time... brr)
-Geo test (Andrea)
Andrea wrote a wiki page,
http://mailman.fe.infn.it/superbwiki/index.php/Geant4_SuperB_simulation_main_portal/GeoDebug
with the directions for the sub detectors to check its own geometries.
- Job submission tools (Andrea)
Andrea is in contact with the book - keeping & job submission tools. A first set of job was launched.
The tools are in good shape. Fabrizio suggests to ask a short report to Armando Fella for the next meeting.
Next meeting will take place on Tuesday, December the 22nd at 17:00 CET (8:00 A.M. Pacific Time, 11:00 A.M. Eastern Time)
Action Items
- Riccardo has to quickly inspect for code developments collisions, resolve them with the help of Andrea / Eugenio and commit
the new code into the Bruno "monolithic" trunk
- Andrea, Mauro and Gigi have to cooperate to code and test the new truth Monte Carlo policies for the IFR
- Doug, Leonid and Eugenio must finalize the gdml code of the PID and sensitize it
- Each sub detector have to test its own geometry following Andrea's direction
- Each sub detector should begin to think at the production cuts they need to simulate.
There are minutes attached to this event.
Show them.