II Timing & Synchronization Workshop

Europe/Rome
Giambiagi Lecture Hall, Adriatico Guesthouse (ICTP, Trieste)

Giambiagi Lecture Hall, Adriatico Guesthouse

ICTP, Trieste

    • 09:00 09:10
      Welcome 10m
      Speaker: A. Gallo - INFN-LNF
    • 09:10 09:30
      Installation, commissioning and operation of the master laser oscillator at FLASH 20m
      Speaker: P. Gessler - DESY
      Slides
    • 09:30 09:50
      Specifications of the FERMI@Elettra optical hybrid timing system 20m
      Speaker: M. Ferianis - Sincrotrone Trieste
      Slides
    • 09:50 10:10
      Layout and specification of the synchronization system for SPARC-X 20m
      Speaker: M. Bellaveglia - INFN-LNF
      Slides
    • 10:10 10:30
      Layout of the PSI-XFEL synchronization system and latest results 20m
      Speaker: S. Hunziker - PSI
      Slides
    • 10:30 10:50
      Layout of the synchronization system for the NLS (incl. experience with fiber laser system at the ERL) 20m
      Speaker: S. Jamison, G. Hirst - STFC
      Slides
    • 10:50 11:20
      Coffee Break 30m
    • 11:20 11:40
      Synchronization of Ti:Sapphire lasers to the optical reference system 20m
      Speaker: V. Arsov - DESY
      Slides
    • 11:40 12:00
      Latest results on laser synchronization at Elettra 20m
      Speaker: M. Danailov, P. Sigalotti - Sincrotrone Trieste
      Slides
    • 12:00 12:20
      Options and performance of laser to RF conversion schemes 20m
      Speaker: F. Ludwig, P. Gessler - DESY
      Slides
    • 12:20 12:40
      Precision timing distribution for LCLS laser synchronization 20m
      Speaker: R. Wilcox - LBL
      Slides
    • 12:40 14:15
      Lunch 1h 35m
    • 14:15 14:35
      Challenges on a BAM implementation in an accelerator 20m
      Speaker: F. Loehl - DESY
      Slides
    • 14:35 14:55
      Required infrastructure for the implementation of an optical synchronization system 20m
      Speaker: A. Winter - ITER
      Slides
    • 14:55 15:15
      New developments and missing components of an optical synchronization system 20m
      Speaker: H. Schlarb - DESY
      Slides
    • 15:15 15:45
      Coffee Break 30m
    • 15:45 17:45
      Discussion: Engineering of main components and global T&S system implementation over large scales issues 2h
    • 17:45 18:00
      Conclusions 15m
  • Tuesday, 10 March
    • 12:35 12:55
      Summary report of the "II Timing and Synchronization Workshop" 20m
      Speaker: T. Quast - BESSY
      Slides