INFN Mezzanine
from
Tuesday, 22 September 2015 (14:00)
to
Thursday, 24 September 2015 (15:00)
Monday, 21 September 2015
Tuesday, 22 September 2015
15:30
Goal of the meeting, the next months
-
Fabrizio Palla
(
PI
)
Goal of the meeting, the next months
Fabrizio Palla
(
PI
)
15:30 - 16:00
Room: 250
16:00
Geometry, pattern banks and data formats
-
Sebastien Viret
(
CNRS/IN2P3
)
Geometry, pattern banks and data formats
Sebastien Viret
(
CNRS/IN2P3
)
16:00 - 16:45
Room: 250
16:45
Status of the PCA (in C++) and its floating point implementation
-
Loriano Storchi
(
P
)
Status of the PCA (in C++) and its floating point implementation
Loriano Storchi
(
P
)
16:45 - 17:15
Room: 250
17:15
Thermal analysis of the mezzanine
Thermal analysis of the mezzanine
17:15 - 17:45
Room: 250
Wednesday, 23 September 2015
09:00
Lookup table and constants
Lookup table and constants
09:00 - 09:30
Room: 250
09:30
Filtering/reducing combinations FW
Filtering/reducing combinations FW
09:30 - 10:00
Room: 250
10:00
Filtering/reducing combinations 2
-
Massimo Casarsa
(
TS
)
Filtering/reducing combinations 2
Massimo Casarsa
(
TS
)
10:00 - 10:20
Room: 250
10:20
Pausa caffe'
Pausa caffe'
10:20 - 10:50
Room: 250
10:50
Status of DO and TF firmware
-
Christos Gentsos
(
Auth
)
Status of DO and TF firmware
Christos Gentsos
(
Auth
)
10:50 - 11:20
Room: 250
11:20
Status of AM06 chip and changes wrt AM05
-
Alberto Annovi
(
PI
)
Status of AM06 chip and changes wrt AM05
Alberto Annovi
(
PI
)
11:20 - 11:50
Room: 250
11:50
Aurora link firmware status
-
Guido Magazzu'
(
PI
)
Aurora link firmware status
Guido Magazzu'
(
PI
)
11:50 - 12:20
Room: 250
12:30
Pausa pranzo
Pausa pranzo
12:30 - 14:00
Room: 250
14:00
Status of the AM05 mezzanine tests - what have we learned?
-
Giacomo Fedi
(
PI
)
DANIEL MAGALOTTI
(
PG
)
Guido Magazzu'
(
PI
)
Status of the AM05 mezzanine tests - what have we learned?
Giacomo Fedi
(
PI
)
DANIEL MAGALOTTI
(
PG
)
Guido Magazzu'
(
PI
)
14:00 - 15:00
Room: 250
15:00
Proposed changes for the AM06 mezzanine
Proposed changes for the AM06 mezzanine
15:00 - 16:00
Room: 250
16:00
Pausa caffe'
Pausa caffe'
16:00 - 16:30
Room: 250
16:30
16:30 - 17:30
Room: 250
Thursday, 24 September 2015
09:00
Discussion on mezzanine qualification procedures
-
Bruno Checcucci
(
PG
)
Discussion on mezzanine qualification procedures
Bruno Checcucci
(
PG
)
09:00 - 10:00
Room: 250
10:00
Discussion on firmware integration policy
Discussion on firmware integration policy
10:00 - 10:30
Room: 250
10:30
Pausa caffe'
Pausa caffe'
10:30 - 11:00
Room: 250
11:00
Signup for the AM06 mezzanine work and item distribution
Signup for the AM06 mezzanine work and item distribution
11:00 - 12:00
Room: 250
Test 4 AM blocks cross talk and operations with 4 AM blocks (including sync) Check the power budget of the mezzanine (measurements and availability from the Pulsar 2b, including external power) Check the clock jitter. Clock should be changed anyway to match Xilinx specs. Check external memory needs. Measure the time of access. Decide which type. Evaluate resources needs for the FPGA including all FW. Evaluate the time to modify the PCB for 8 AM chips Evaluate the time to modify the PCB to accommodate the needed changes NB: the last 2 items depend on how many engineers will be working. So Time and FTE estimates.
12:00
Plan for the next months
Plan for the next months
12:00 - 12:30
Room: 250