Previous week recap (by person) — week of this meeting
Davide P.
- Mouser components: both batches arrived at LNF.
- 1/8" gas connectors shipped to LNF (TNT tracking MY17155749).
- Source flange + new O-ring successfully tested on the vessel.
- Tecnoalarm reshaped bandellas; Daniele’s small modification scheduled for immediate test.
- Nylon66 structure partially reshaped; residual 1–2 mm sagitta under recovery.
- Copper-box handling: meeting held/scheduled with Franco Tacca (LNGS tunnel handling constraints).
- Nitrogen MFC and HV box expected at LNF for tests (tomorrow).
Davide F.
- Rometec affidamento a consumo confirmed active; issues/misunderstandings to be reviewed.
- O₂ + humidity sensors procurement blocked waiting for required documents.
- LNGS gas order planned for this week.
- LN₂ + filters integration still waiting on NIER feedback.
- Copper-box movement procedure to be closed/reviewed with Cesidio; execution to be managed by LNGS services.
- Copper-box drawings progressing but delayed by 3DExperience workflow issues.
- GEM inner frames still non-compliant after re-machining; new corrective intervention planned with Daniele + Tecnoalarm.
- Directionality paper submitted to PubCom; HFO corrections ongoing.
Fabrizio
- Simulation paper accepted with minor revisions; resubmission deadline 12 March; reviewer comments to be forwarded to PubCom and addressed.
- PD2025 proceedings: attempted late recovery by drafting the 5-page contribution.
Andrea
- Contacted authors of arXiv:2602.02694 (sub-GeV DM with hydrogen) regarding missing CYGNO citation; authors agreed to correct in v2.
-
09:01
→
09:02
DavideP report 1mSpeaker: Davide Pinci (Istituto Nazionale di Fisica Nucleare)
- Mouser components: Herman is ready to go. This week he is going to assemble the 50ohms termination resistors in the Trigger Module
- Source flange + new O-ring successfully tested on the vessel + 1/8" gas connectors successfully tested up to + 3 mbar
- issue with 3D experience permissions is slowing the closing of the copper box drawings
-
09:02
→
09:03
Elisabetta report 1mSpeaker: Elisabetta Baracchini (Istituto Nazionale di Fisica Nucleare)
-
09:03
→
09:04
DavideF report 1mSpeaker: Davide Fiorina (GSSI & INFN)
-
Humidity sensor: current provider cannot work with Public Administration; searching for an alternative supplier.
-
O₂ sensor: waiting for the quote and required documents.
-
Copper box drawings: 3DS issue solved, Antonio will provide the drawings this week
-
Inner GEM frames: retrofitted by Tecnoalarm; assembly test scheduled for tomorrow.
-
Rometec order: first batch submitted.
-
Hall F inspection: walkthrough with technicians and LNGS services to finalize service routing paths.
-
Water tanks: new transport to LNF today.
-
This week: Preparing setup for Herman to test the trigger module
-
Line for LN2 should be done in conitinuos copper line, not SS and swagelok
-
-
09:04
→
09:05
Giorgio report 1mSpeaker: Giorgio Dho (Istituto Nazionale di Fisica Nucleare)
-
09:05
→
09:06
Stefano report 1mSpeaker: Stefano Piacentini (GSSI and INFN LNGS)
-
09:06
→
09:07
Giulia report 1mSpeaker: Giulia D'Imperio (Istituto Nazionale di Fisica Nucleare)
-
09:07
→
09:08
Fabrizio report 1mSpeaker: Fabrizio Petrucci (Istituto Nazionale di Fisica Nucleare)
-
09:08
→
09:09
Andrea report 1mSpeaker: Andrea Messina (Istituto Nazionale di Fisica Nucleare)
-