DavideP reportSpeaker: Davide Pinci (Istituto Nazionale di Fisica Nucleare)
- Cesidio has sent the corrections to Antonio, who should implement them this week. I am mailing them to clarify:
- whether the corrections are all there or whether Cesidio is still going through the material;
- whether Antonio expects to finish by Friday 23rd;
- I am requesting instructions from Roberto to start purchasing on Amazon.
- Cesidio has sent the corrections to Antonio, who should implement them this week. I am mailing them to clarify:
- 2
-
3
DavideF reportSpeaker: Davide Fiorina (GSSI & INFN)
- To assemble the GEM stack we lack of two type of screws. Roberto is trying to find them out in Amazon Business to be bought at RM1
- Similar problem with O-ring cord 1.78mm but for closing the PMMA box
- Order for Nylon66 fittings with Affidamento a consume in Research Division LNGS 500€ almost started
- Trying to open an Affidamento a Consumo to Rometech in GSSI around 20k€ until 31/12/26 (with 13.5k€ to be spent for sure). The General Director is not seeing that as as possible, but we have to talk
- Thursday 22/01/26 maybe trasport from LNF to bring chiller and other stuff and to take some of the LIME water tanks
- Huge technician mission next week with gas system test
- HFO paper is almost finished sending it to Florian to crosscheck
- Started to work with Samuele on directionality paper first meeting this week
- I have to disentagle the Polyethylene situation with Andrea Ianni
- Pressing Antonio to do something on the Copper form the Cesidio input idea is to finish end of month
-
4
Giorgio reportSpeaker: Giorgio Dho (Istituto Nazionale di Fisica Nucleare)
- No news from analysis. This Thursday meeting and today I will send mail to all members with task
- I will also write to Rob and Ali from AU. What about Lindsey? Was he simulation interested?
- Screws and HV oring still to be searched
- This week the dry run might be stopped by CERN material arrival for another experiment
- Moving box PMMA into the clean room, and cleaning of the romm required
- Daniele will warn me/Davide when he will be able to start mounting
- Window cleaning and oring positioning will start soon and Cesidio's test on strength to apply to close the windows as soon as one window with oring is mounted
-
5
Stefano reportSpeaker: Stefano Piacentini (GSSI and INFN LNGS)
Week to-do list:
- closure of the radio-pure copper purchase from administrative point of view (waiting for reply by Virginia)
- recollect and organize the tasks of WP5 in view of the "succession" of WP5 Coordinator (Gas System / HV / Calibration tasks)
- no advancement foreseen this week from the DAQ / event builder point of view
- development of backend and eventually we interface to navigate/query the content of the
#coordinationdiscord chat
-
6
Fabrizio reportSpeaker: Fabrizio Petrucci (Istituto Nazionale di Fisica Nucleare)
- 7
-
1