Cesidio has sent the corrections to Antonio, who should implement them this week. I am mailing them to clarify:
whether the corrections are all there or whether Cesidio is still going through the material;
whether Antonio expects to finish by Friday 23rd;
I am requesting instructions from Roberto to start purchasing on Amazon.
09:02
→
09:03
Elisabetta report1m
Speaker:
Elisabetta Baracchini(Istituto Nazionale di Fisica Nucleare)
GEM simulation for NID studies
09:03
→
09:04
DavideF report1m
Speaker:
Davide Fiorina(GSSI & INFN)
To assemble the GEM stack we lack of two type of screws. Roberto is trying to find them out in Amazon Business to be bought at RM1
Similar problem with O-ring cord 1.78mm but for closing the PMMA box
Order for Nylon66 fittings with Affidamento a consume in Research Division LNGS 500€ almost started
Trying to open an Affidamento a Consumo to Rometech in GSSI around 20k€ until 31/12/26 (with 13.5k€ to be spent for sure). The General Director is not seeing that as as possible, but we have to talk
Thursday 22/01/26 maybe trasport from LNF to bring chiller and other stuff and to take some of the LIME water tanks
Huge technician mission next week with gas system test
HFO paper is almost finished sending it to Florian to crosscheck
Started to work with Samuele on directionality paper first meeting this week
I have to disentagle the Polyethylene situation with Andrea Ianni
Pressing Antonio to do something on the Copper form the Cesidio input idea is to finish end of month
09:04
→
09:05
Giorgio report1m
Speaker:
Giorgio Dho(Istituto Nazionale di Fisica Nucleare)
No news from analysis. This Thursday meeting and today I will send mail to all members with task
I will also write to Rob and Ali from AU. What about Lindsey? Was he simulation interested?
Screws and HV oring still to be searched
This week the dry run might be stopped by CERN material arrival for another experiment
Moving box PMMA into the clean room, and cleaning of the romm required
Daniele will warn me/Davide when he will be able to start mounting
Window cleaning and oring positioning will start soon and Cesidio's test on strength to apply to close the windows as soon as one window with oring is mounted
09:05
→
09:06
Stefano report1m
Speaker:
Stefano Piacentini(GSSI and INFN LNGS)
Week to-do list:
closure of the radio-pure copper purchase from administrative point of view (waiting for reply by Virginia)
recollect and organize the tasks of WP5 in view of the "succession" of WP5 Coordinator (Gas System / HV / Calibration tasks)
no advancement foreseen this week from the DAQ / event builder point of view
development of backend and eventually we interface to navigate/query the content of the #coordination discord chat
09:06
→
09:07
Fabrizio report1m
Speaker:
Fabrizio Petrucci(Istituto Nazionale di Fisica Nucleare)
09:07
→
09:08
Andrea report1m
Speaker:
Andrea Messina(Istituto Nazionale di Fisica Nucleare)