Things to be Decided/Frozen
-
Filippo Rosatelli
(
Istituto Nazionale di Fisica Nucleare
)
Antonio Croce
(
Istituto Nazionale di Fisica Nucleare
)
Bruno Ponzio
(
Istituto Nazionale di Fisica Nucleare
)
Emiliano Dane'
(
Istituto Nazionale di Fisica Nucleare
)
Emilio Capitolo
(
Istituto Nazionale di Fisica Nucleare
)
Lorenzo Roscilli
(
Istituto Nazionale di Fisica Nucleare
)
Things to be Decided/Frozen
Filippo Rosatelli
(
Istituto Nazionale di Fisica Nucleare
)
Antonio Croce
(
Istituto Nazionale di Fisica Nucleare
)
Bruno Ponzio
(
Istituto Nazionale di Fisica Nucleare
)
Emiliano Dane'
(
Istituto Nazionale di Fisica Nucleare
)
Emilio Capitolo
(
Istituto Nazionale di Fisica Nucleare
)
Lorenzo Roscilli
(
Istituto Nazionale di Fisica Nucleare
)
14:30 - 16:00
-- Reference for the T-trolley Define if a concrete platform is needed or not A complete concrete platform is needed? Not only for the references but also for the lateral rails Define and freeze the tool for the alignment where the T-trolley is positioned for the HSs mating -- T-trolley layout of the plates connecting the beams mech drawings purchase the angulars decision if needed a lifting system embedded or not (lifting system to be frozen) decision on wich type of wheels The 2 heads is prototyping The part of the services is going to be designed soon: only the part for the EC (cables and HV connector) -- Lateral rails decision on the possibility to substitute the lateral trolleis with lateral rails is taken to be decided the height from the platform and the system of the connection with the cradles -- Cradles A problem in the mating of the cradles is raised up then the strategy now is to complete the construction (the part of the services is still missing) then a complete metrology survey during the assembly is forseen Part of the carriage connection to the lateral rails has to be designed yet