Rete MS&TA - Enrico Leo " A new test facility for the site acceptance test of SIS100 quadrupole doublet modules"
Thursday, 26 May 2022 -
15:00
Monday, 23 May 2022
Tuesday, 24 May 2022
Wednesday, 25 May 2022
Thursday, 26 May 2022
15:00
A new test facility for the site acceptance test of SIS100 quadrupole doublet modules
A new test facility for the site acceptance test of SIS100 quadrupole doublet modules
15:00 - 15:45
New test facility for SAT of SIS100 quadrupole doublet modules Enrico Leo The SIS100 synchrotron is presently under construction, and it will be part of the FAIR particle accelerator facility at GSI-Darmstadt. The bending, focusing, as well as high order corrections of the ion beam is demanded to superconducting magnets (dipoles, quadrupoles and correctors). Quadrupoles and correctors are integrated in modules, together with temperature sensors, vacuum gauges and beam diagnostic systems. To ensure the quality standard, after the warm factory acceptance test, also cryogenic tests on the modules have to be carried out before installation in the SIS100 tunnel. Following a MoU between GSI and INFN, a new test facility for site acceptance test on quadrupole doublets modules (QDM) has been set up in Salerno. The test facility has been designed to fulfill the requirements of the GSI test protocol. The protocol foresees a full characterization of the QDM going through electrical tests, sensor and beam diagnostic integrity and functionality, heat load measurements, as well as vacuum quality. All of these tests have to be carried out at different conditions: room temperature/pressure, under vacuum from room temperature to 4.5K and at room temperature/pressure again. The design and commissioning of the test facility in Salerno will be presented together with preliminary results obtained during the first cooldown of the prototype superconducting modules (FoS).
15:45
Discuzione
Discuzione
15:45 - 16:00