16:30
Installation of DBBs on feedthrough flanges on ICARUS
-
Guang Meng
(PD)
-
16:40
Installation of the signal flanges in the ICARUS T600 detector
-
Alberto Braggiotti
(INFN-Padova)
-
16:50
Installation on-site of the TPC mini-crates, population with CAEN A2795 boards and cabling of the ICARUS read-out electronics
-
Marino Nicoletto
(PD)
-
17:00
Installation, Activation and Readiness Test of the ICARUS Low Voltage Power Supply
-
Gabriele Rampazzo
(PD)
-
17:10
Overview on the installation and tests of the ICARUS LAr-TPC readout electronics
-
Alberto Guglielmi
(PD)
-
17:20
Tools for LAr purity measurement and for wire signal calibration in the ICARUS T600 detector
-
Christian Farnese
(PD)
-
17:30
Report on INTENSE (WP-2) activity at FNAL: September 9-October 7 2019
-
Filippo Varanini
(PD)
-
17:40
ICARUS Side CRT preparation June 12 – July 12, 2019
-
Francesco Tortorici
(CT)
-
17:50
Analysis of Monte Carlo events for ICARUS PMT trigger studies
-
Alessandro Menegolli
(PV)
-
18:00
INTENSE activity: report of Gian Luca Raselli
-
Gian Luca Raselli
(PV)
-
18:10
INTENSE activity: report of Massimo Rossella
-
Massimo Rossella
(PV)