-
4:30 PM
Installation of DBBs on feedthrough flanges on ICARUS
-
Guang Meng
(PD)
-
4:40 PM
Installation of the signal flanges in the ICARUS T600 detector
-
Alberto Braggiotti
(INFN-Padova)
-
4:50 PM
Installation on-site of the TPC mini-crates, population with CAEN A2795 boards and cabling of the ICARUS read-out electronics
-
Marino Nicoletto
(PD)
-
5:00 PM
Installation, Activation and Readiness Test of the ICARUS Low Voltage Power Supply
-
Gabriele Rampazzo
(PD)
-
5:10 PM
Overview on the installation and tests of the ICARUS LAr-TPC readout electronics
-
Alberto Guglielmi
(PD)
-
5:20 PM
Tools for LAr purity measurement and for wire signal calibration in the ICARUS T600 detector
-
Christian Farnese
(PD)
-
5:30 PM
Report on INTENSE (WP-2) activity at FNAL: September 9-October 7 2019
-
Filippo Varanini
(PD)
-
5:40 PM
ICARUS Side CRT preparation June 12 – July 12, 2019
-
Francesco Tortorici
(CT)
-
5:50 PM
Analysis of Monte Carlo events for ICARUS PMT trigger studies
-
Alessandro Menegolli
(PV)
-
6:00 PM
INTENSE activity: report of Gian Luca Raselli
-
Gian Luca Raselli
(PV)
-
6:10 PM
INTENSE activity: report of Massimo Rossella
-
Massimo Rossella
(PV)